Steam-Boiler Service
- Body-Repair,
- Maintenance,
- Refurbish,
- Relocation,
- New-Install,
- Cleaning
PALUGADA ENGINEERING, sejak tahun 1988 telah melayani pekerjaan yang berhubungan dengan :
- Power Steam Boiler
- Water Tube Site Installation
- Inspection and Testing of Pressure Part
- Re-tubing of :
- Generating Tubes
- Finned Tubes
- Economizer Tubes
- Super-heater Tubes
- Re-heater Tubes
- Down-comer Tubes
- Internal-part of Steam-drum
- Industrial Steam Boiler
- Efficiency Analysis
- Accessories and Equipment
- De-aerator Feed Water Tank
- Economizer
- Steam Header
- Condensate Tank
- Fuel Oil Tank
- Oil and Gas Burner
- Coal Stoker
- Chimney Stack
- Piping, Valves, Steam-trap Installation
- Hot Oil Boiler/ Thermal Oil Boiler
- Hot Water Boiler
- Hot Water Heat-exchanger
- Repair and Maintenance
- Re-tubing
- Furnace Replacement
- Tubes-plate Replacement
- Repair of Body Shell
- Chemical Cleaning
- Mechanical Cleaning
- Thermal Insulation and Cladding
- Interconnecting Piping
- Tangki-tangki Silo untuk Storage
- Tangki-tangki Product untuk Transportasi
- Steel-Construction untuk Boiler House
- Relocation of Steam Boiler
- Turn-key Project bersama Consultant
Atau Langsung Telepon Kami:
WA Call/Telp: 0823 1108 7999
Email: palugada.engineering@gmail.com
mas ADI
Berikut ilustrasi gambar yang dapat kami kerjakan:

Water Tube Site Erection

Tube Plate Replacement

Hydro-static Test Inspection

Dye Penetrant Of Drum-Shell

Penetrant Control On Heat-Exchanger

Leak between Tube-Shell by Penetrant

Radiographic Tubes Inspection Methode

Radiographic by NDT Expert

Mechanical Cleaning

Chemical Circulation Cleaning

Tools for Mechanical Cleaning

Renew-stubbing of Steam Header

Re-tubing of Generating Tubes

Finned-tubes for Economizer

Ready Bended Tubes for Superheater

Re-heater Tubes for Power Boiler

Internal Part of Steam Drum

Flow Water Analysis for Efficiency

Combustion Measuring to check Efficiency

Re-engineering for Effectivity & Efficiency

De-aerator Feed Water Tank

Steam Sprayer Injected to D-FW Tank

Economizer for Industrial Boiler

Steam Header Drum

Blow-down Vessel to Save Energy

Condensate Tank for Recovery

Fuel Oil Tank

Pipe-line for Boiler’s Gas Burner

Burner for Steam Boiler

Coal Stoker installed in the Boiler

Chimney Stack under Fabrication

Piping in the Processing Room
Atau Langsung Telepon Kami:
WA Call/Telp: 0823 1108 7999
Email: palugada.engineering@gmail.com
mas ADI

Steam Piping to Heat-Up CPO

Steam Globe Valves

Safety Valves by Spirax

Strainer for Steam Lines

Steam Trap from Spirax

Check-Valve from Spirax

Steam Operated Condensate Pump

Sight Glass for Condensate Line

Probe Water Level Controler for Boiler

Float Water Level Controller

Combination Gauge and Level Controller

Auto & Manual Blowdown Spx Valve

Common Flanges Connector

Spiral Gasket for Steam Lines

Steam Boiler Oil Fuel by MIURA

Thermal Oil Boiler by MIURA

Hot Water Boiler by MIURA

Hot Water Calorifier by Spirax

Air Receiver Tank for Process Service

Storage Tank under construction

Finished Storage Tank

Demin Plant to Supply Boiler Water

Relocation of Steam Boiler

ISO Tank to Send Finished Product

Silo Tank to Collect Product

Steel Contruction for Boiler Plant

Turn-key Project in South-Borneo
Demikian ilustrasi pekerjaan yang dapat kami lakulan untuk melayani kebutuhan pelanggan kami.
Bila ada kebutuhan, silakan menghubungi kami di kontak di nomor WA 0823.1108.7999
Salam hormat,
PALUGADA Engineering